Samsun Ladik Solar Power Plant — Samsun · Ladik
Ground-Mounted Solar Completed

Samsun Ladik Solar Power Plant

The large-scale site installed in Ladik was equipped with tracker (sun-tracking) systems to achieve maximum production even under winter conditions. It stands as a site-specific engineering success, enabling municipal infrastructure to be powered by renewable energy.

Project Information

  • Location: Samsun, Ladik
  • Completion: 2024
  • Team: ~500–600 people (large-scale site operation)
  • Duration: 4 months
  • Service: Installation / EPC
  • Partner: SMART Energy — Samsun Metropolitan Municipality

Key Highlights

  • Maximization of solar gain through the implementation of tracking (tracker) systems.
  • Engineering adaptations on sloped terrain with winter performance taken into consideration.
  • Large-scale municipal application with collective public benefit at the forefront.

Provided Benefits

  • Substantial reduction in the municipality’s (SASKİ, etc.) electricity expenses.
  • Improved performance against seasonal fluctuations in energy production.
  • Long-term operational cost advantage.

Technical Details

  • ~57,265 kWp installed capacity (tracking system solution).

Other Projects