ŞUSKİ Karaköprü Solar Power Plant — Şanlıurfa · Karaköprü
Ground-Mounted Solar Completed

ŞUSKİ Karaköprü Solar Power Plant

The large-scale facility constructed at the Karaköprü site was designed to remain operational even under challenging site conditions and disaster scenarios. Through a combination of fixed and tracking solar panels, reliable renewable energy is supplied to regional water and municipal services.

Project Information

  • Location: Şanlıurfa, Karaköprü
  • Completion: 2023
  • Team: ~70–80 people
  • Duration: 4–5 months
  • Service: Installation / EPC (large-scale site application)
  • Partner: Şanlıurfa Water and Sewerage Administration General Directorate

Key Highlights

  • Combination of large-scale fixed systems and tracking units.
  • Operational success under challenging site conditions (earthquake/flood periods).
  • Hybrid use of both fixed and tracking technologies.

Provided Benefits

  • Long-term energy security for regional water and municipal infrastructure.
  • Significant and permanent savings in electricity costs.
  • Service continuity ensured through rapid commissioning.

Technical Details

  • ~18 MWp installed capacity (fixed systems + ~550 kWp tracking sections).