TÜBİTAK MAM – İZSU Solar Power Plant — İzmir · Menemen
Hybrid Solar Completed

TÜBİTAK MAM – İZSU Solar Power Plant

The hybrid installation implemented in İzmir Menemen combines both rooftop and ground-mounted systems, supplying İZSU’s electricity needs on-site in a clean and independent manner. With off-grid flexible panels, site efficiency was increased, and the installation contributed to the institution’s energy independence.

Project Information

  • Location: İzmir, Menemen
  • Completion: 2024
  • Team: ~35 people
  • Duration: 4 months
  • Service: Installation / EPC
  • Partner: TÜBİTAK Marmara Research Center – İzmir Water and Sewerage Administration General Directorate

Key Highlights

  • Hybrid design combining both rooftop and ground-mounted applications.
  • Off-grid, flexible panel installation — adaptation to site conditions.
  • Institution-specific, on-site energy generation approach.

Provided Benefits

  • Permanent reduction in the institution’s electricity costs.
  • Operational independence and resource optimization.
  • Long-term sustainable energy supply.

Technical Details

  • Site-specific flexible panel solutions; an off-grid section of approximately 100 kW was implemented.