TÜBİTAK MAM – İZSU Hydropower Plant — İzmir · Karabağlar
Hydropower Completed

TÜBİTAK MAM – İZSU Hydropower Plant

The project implemented in İzmir Karabağlar generated electricity by utilizing the existing water flow. Thanks to the underground system, an environmentally harmonious and invisible energy solution was created without causing any disturbance to the surroundings.

Project Information

  • Location: İzmir, Karabağlar
  • Completion: 2024
  • Duration: 4 months
  • Service: İZSU HPP Pump Station Installation

Key Highlights

  • Conversion of existing water flow into energy
  • Underground system → no visual pollution
  • Silent, sustainable, and environmentally friendly solution

Provided Benefits

  • Significant reduction in electricity costs
  • Long-term, uninterrupted energy generation
  • Minimization of carbon footprint

Technical Details

  • Water flow efficiently converted into electricity
  • Environmentally friendly design enabled by underground infrastructure