General Directorate of Mining and Petroleum Affairs – Solar Power Plant Project

Project Information

  • 📍 Location: Ankara
  • 📅 Completion: July 2025
  • 👥 Team: 18 people
  • ⏱ Duration: 2 months
  • ⚡ Service: Installation / EPC

Key Highlights

  • Open parking area converted into a covered structure for panel installation (carport system)
  • Environmentally friendly solution with long-term savings
  • Addressing multiple needs simultaneously

Provided Benefits

  • Prevention of high electricity bills
  • Sustainable, cost-effective energy generation for many years
  • Reduction of carbon footprint

Technical Details

  • Grade A, high-efficiency panels were used

Diğer Projelerimiz

TÜBİTAK SAGE – Solar Power Plant Project

The solar power plant project completed in Ankara Mamak was installed to directly meet TÜBİTAK SAGE’s energy needs. Through rooftop-integrated panels, the institution’s electricity consumption was reduced, bringing together cost savings and environmental responsibility.

Detaylar

TÜBİTAK MAM – İZSU Solar Power Plant Project

The hybrid installation implemented in İzmir Menemen combines both rooftop and ground-mounted systems, supplying İZSU’s electricity needs on-site in a clean and independent manner. With off-grid flexible panels, site efficiency was increased, and the installation contributed to the institution’s energy independence.

Detaylar

Samsun – Solar Power Plant Project

The large-scale site installed in Ladik was equipped with tracker (sun-tracking) systems to achieve maximum production even under winter conditions. It stands as a site-specific engineering success, enabling municipal infrastructure to be powered by renewable energy.

Detaylar

Kastamonu – Solar Power Plant Project

The Taşköprü marketplace was covered with solar panels, providing a more comfortable environment for vendors while simultaneously meeting the municipality’s energy needs through on-site generation — a dual-purpose solution for the benefit of the community.

Detaylar

ŞUSKİ – Karaköprü Solar Power Plant Project

The large-scale facility constructed at the Karaköprü site was designed to remain operational even under challenging site conditions and disaster scenarios. Through a combination of fixed and tracking solar panels, reliable renewable energy is supplied to regional water and municipal services.

Detaylar