Project Information
- 📍 Location: Ankara
- 📅 Completion: July 2025
- 👥 Team: 18 people
- ⏱ Duration: 2 months
- ⚡ Service: Installation / EPC
Key Highlights
- Open parking area converted into a covered structure for panel installation (carport system)
- Environmentally friendly solution with long-term savings
- Addressing multiple needs simultaneously
Provided Benefits
- Prevention of high electricity bills
- Sustainable, cost-effective energy generation for many years
- Reduction of carbon footprint
Technical Details
- Grade A, high-efficiency panels were used


