Project Information
- 📍 Location: İzmir, Menemen
- 📅 Completion: 2024
- 👥 Team: ~35 people
- ⏱ Duration: 4 months
- ⚙️ Service: Installation / EPC
- Partner: TÜBİTAK Marmara Research Center – İzmir Water and Sewerage Administration General Directorate
Key Highlights
- Hybrid design combining both rooftop and ground-mounted applications.
- Off-grid, flexible panel installation — adaptation to site conditions.
- Institution-specific, on-site energy generation approach.
Provided Benefits
- Permanent reduction in the institution’s electricity costs.
- Operational independence and resource optimization.
- Long-term sustainable energy supply.
Technical Details
- Site-specific flexible panel solutions; an off-grid section of approximately 100 kW was implemented.