Project Information
- 📍 Location: Samsun, Ladik
- 📅 Completion: 2024
- 👥 Team: ~500–600 people (large-scale site operation)
- ⏱ Duration: 4 months
- ⚙️ Service: Installation / EPC
- Partner: SMART Energy — Samsun Metropolitan Municipality
Key Highlights
- Maximization of solar gain through the implementation of tracking (tracker) systems.
- Engineering adaptations on sloped terrain with winter performance taken into consideration.
- Large-scale municipal application with collective public benefit at the forefront.
Provided Benefits
- Substantial reduction in the municipality’s (SASKİ, etc.) electricity expenses.
- Improved performance against seasonal fluctuations in energy production.
- Long-term operational cost advantage.
Technical Details
- ~57,265 kWp installed capacity (tracking system solution).